Category: Drilling Operations on Surtsey
The drilling operation began on 24 July with the arrival of the advance crew on Surtsey. The Coast Guard boat and helicopter mobilization was on 28-30 July. The drilling operation ended with the final demobilization with Coast Guard boat and helicopter on 10 September. The first core was obtained on 10 August 2017.